{"id":13448,"date":"2022-12-05T13:02:11","date_gmt":"2022-12-05T12:02:11","guid":{"rendered":"https:\/\/www.afro-impact.com\/mali-gouina-hydroelectric-dam-inaugurated\/"},"modified":"2023-06-19T11:29:45","modified_gmt":"2023-06-19T10:29:45","slug":"mali-gouina-hydroelectric-dam-inaugurated","status":"publish","type":"post","link":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/","title":{"rendered":"Mali: Gouina hydroelectric dam inaugurated"},"content":{"rendered":"\n<p><strong>Mali&#8217;s interim Prime Minister, Colonel Abdoulaye Ma\u00efga, and those of Guinea, Bernard Goumou, Mauritania, Mohamed Bilal Messaoud and Senegal, Amadou Ba, inaugurated the Gouina hydroelectric dam on Saturday, 45 km from Kayes, in western Mali. The dam is a regional project with a capacity of 140 megawatts (MW) and is being built by the Organisation pour la Mise en Valeur du fleuve S\u00e9n\u00e9gal (OMVS).<\/strong><\/p>\n\n<p>The infrastructure is located on the Senegal River, the ninth longest river in Africa. The 1,347-metre-long structure has a dam height of 19 metres, a storage capacity of 136 million cubic metres and is connected to the Manantali Electricity Management Company (SOGEM), which was already producing 260 megawatts from Manantali and F\u00e9llou. <strong>This infrastructure will make it possible to &#8220;increase the production capacity of Manantali to 340 megawatts<\/strong>&#8220;, said Mali&#8217;s interim Prime Minister, Abdoulaye Ma\u00efga, during the inauguration ceremony.<\/p>\n\n<p>Thus, &#8220;the dam has a nominal installed capacity of 140 megawatts and an average output of 607 gigawatts\/hour. Its total cost is about 284 billion CFA francs (454 million dollars), of which 248.9 billion CFA francs (398 million dollars) are financed by Eximbank of China and 34.5 billion CFA francs (54 million dollars) by the Soci\u00e9t\u00e9 de Gestion de l&#8217;Energie de Manantali (SOGEM)&#8221;, he detailed.<\/p>\n\n<p>According to Mali&#8217;s Minister of Mines, Energy and Water, Lamine Seydou Traor\u00e9, &#8220;this structure, which has already been put into service and which has begun to inject the first megawatts into the electricity grids of the three countries that are shareholders in SOGEM, will make it possible to strengthen the production of energy in these countries, but beyond the strengthening of energy, it should make it possible to reduce the cost of production for the companies of our three countries. It also states that <strong>&#8220;the 140 megawatts will be divided equally between the energy companies of Mali, Guinea, Mauritania and Senegal&#8221;.<\/strong><\/p>\n\n<p>Taking advantage of the occasion, Colonel Maiga urged OMVS to redouble its efforts for the implementation, as soon as possible, of another larger hydroelectric dam: that of Koukoutamba in Guinea. This will cover the energy needs of the four OMVS member states, according to the organisation. With a capacity of 294 megawatts, it will be the largest of all the structures built by OMVS since its creation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mali&#8217;s interim Prime Minister, Colonel Abdoulaye Ma\u00efga, and those of Guinea, Bernard Goumou, Mauritania, Mohamed Bilal Messaoud and Senegal, Amadou Ba, inaugurated the Gouina hydroelectric dam on Saturday, 45 km from Kayes, in western Mali. The dam is a regional project with a capacity of 140 megawatts (MW) and is being built by the Organisation<\/p>\n","protected":false},"author":2,"featured_media":13445,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[194],"tags":[],"class_list":{"0":"post-13448","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-business"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.5 (Yoast SEO v25.5) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Mali: Gouina hydroelectric dam inaugurated - Afro impact<\/title>\n<meta name=\"description\" content=\"Mali&#039;s interim Prime Minister, Colonel Abdoulaye Ma\u00efga, and those of Guinea, Bernard Goumou, Mauritania, Mohamed Bilal Messaoud and Senegal, Amadou Ba, inaugurated the Gouina hydroelectric dam on Saturday, 45 km from Kayes, in western Mali. The dam is a regional project with a capacity of 140 megawatts (MW) and is being built by the Organisation pour la Mise en Valeur du fleuve S\u00e9n\u00e9gal (OMVS).\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mali: Gouina hydroelectric dam inaugurated - Afro impact\" \/>\n<meta property=\"og:description\" content=\"Mali&#039;s interim Prime Minister, Colonel Abdoulaye Ma\u00efga, and those of Guinea, Bernard Goumou, Mauritania, Mohamed Bilal Messaoud and Senegal, Amadou Ba, inaugurated the Gouina hydroelectric dam on Saturday, 45 km from Kayes, in western Mali. The dam is a regional project with a capacity of 140 megawatts (MW) and is being built by the Organisation pour la Mise en Valeur du fleuve S\u00e9n\u00e9gal (OMVS).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/\" \/>\n<meta property=\"og:site_name\" content=\"Afro impact\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfroimpactMag\" \/>\n<meta property=\"article:author\" content=\"https:\/\/facebook.com\/profile.php?id=100075035589093\" \/>\n<meta property=\"article:published_time\" content=\"2022-12-05T12:02:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-06-19T10:29:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/12\/barrage-gouina-mali-inaugure.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Eliane Fatchina\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@AfroimpactMag\" \/>\n<meta name=\"twitter:site\" content=\"@AfroimpactMag\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Eliane Fatchina\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/\"},\"author\":{\"name\":\"Eliane Fatchina\",\"@id\":\"https:\/\/www.afro-impact.com\/#\/schema\/person\/5c48f58a7d0cc36b8d96110a4feedf77\"},\"headline\":\"Mali: Gouina hydroelectric dam inaugurated\",\"datePublished\":\"2022-12-05T12:02:11+00:00\",\"dateModified\":\"2023-06-19T10:29:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/\"},\"wordCount\":376,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.afro-impact.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/12\/barrage-gouina-mali-inaugure.webp\",\"articleSection\":[\"Business\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#respond\"]}],\"copyrightYear\":\"2022\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.afro-impact.com\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/\",\"url\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/\",\"name\":\"Mali: Gouina hydroelectric dam inaugurated - Afro impact\",\"isPartOf\":{\"@id\":\"https:\/\/www.afro-impact.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/12\/barrage-gouina-mali-inaugure.webp\",\"datePublished\":\"2022-12-05T12:02:11+00:00\",\"dateModified\":\"2023-06-19T10:29:45+00:00\",\"description\":\"Mali's interim Prime Minister, Colonel Abdoulaye Ma\u00efga, and those of Guinea, Bernard Goumou, Mauritania, Mohamed Bilal Messaoud and Senegal, Amadou Ba, inaugurated the Gouina hydroelectric dam on Saturday, 45 km from Kayes, in western Mali. The dam is a regional project with a capacity of 140 megawatts (MW) and is being built by the Organisation pour la Mise en Valeur du fleuve S\u00e9n\u00e9gal (OMVS).\",\"breadcrumb\":{\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#primaryimage\",\"url\":\"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/12\/barrage-gouina-mali-inaugure.webp\",\"contentUrl\":\"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/12\/barrage-gouina-mali-inaugure.webp\",\"width\":1024,\"height\":576,\"caption\":\"Aerial view of the Gouina dam on the Senegal River Source photo: rfi\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"News\",\"item\":\"https:\/\/www.afro-impact.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Economie\",\"item\":\"https:\/\/www.afro-impact.com\/economie\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Mali: Gouina hydroelectric dam inaugurated\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.afro-impact.com\/#website\",\"url\":\"https:\/\/www.afro-impact.com\/\",\"name\":\"Afro impact\",\"description\":\"L&#039;Afrique vu autrement\",\"publisher\":{\"@id\":\"https:\/\/www.afro-impact.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.afro-impact.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\/\/www.afro-impact.com\/#organization\",\"name\":\"Afro impact\",\"alternateName\":\"carrecube\",\"url\":\"https:\/\/www.afro-impact.com\/\",\"logo\":{\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#local-main-organization-logo\"},\"sameAs\":[\"https:\/\/www.facebook.com\/AfroimpactMag\",\"https:\/\/x.com\/AfroimpactMag\",\"https:\/\/www.youtube.com\/channel\/UCJNIRcX4sVo487fhv0p5KDw\"],\"publishingPrinciples\":\"https:\/\/www.afro-impact.com\/a-propos-magazine-afro-impact\/\",\"ownershipFundingInfo\":\"https:\/\/www.afro-impact.com\/mentions-legales\/\",\"actionableFeedbackPolicy\":\"https:\/\/www.afro-impact.com\/conditions-generales\/\",\"correctionsPolicy\":\"https:\/\/www.afro-impact.com\/dmca-retrait\/\",\"address\":{\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#local-main-place-address\"},\"geo\":{\"@type\":\"GeoCoordinates\",\"latitude\":\"6.389282121878214\",\"longitude\":\"2.3602318590634495\"},\"telephone\":[\"+229 54900806\"],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"00:00\",\"closes\":\"23:59\"}],\"email\":\"redaction@afro-impact.com\",\"vatID\":\"0 2022 1395 5557\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.afro-impact.com\/#\/schema\/person\/5c48f58a7d0cc36b8d96110a4feedf77\",\"name\":\"Eliane Fatchina\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.afro-impact.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.afro-impact.com\/wp-content\/litespeed\/avatar\/5f9f737261a53c0e086b34b0464cb9e1.jpg?ver=1777623498\",\"contentUrl\":\"https:\/\/www.afro-impact.com\/wp-content\/litespeed\/avatar\/5f9f737261a53c0e086b34b0464cb9e1.jpg?ver=1777623498\",\"caption\":\"Eliane Fatchina\"},\"description\":\"Eliane Yabo Omonlayo Fatchina est une journaliste reporter \u00e0 Afro impact. Titulaire d\u2019une licence professionnelle en journalisme \u00e0 l\u2019ENSTIC du B\u00e9nin, elle est une panafricaniste passionn\u00e9e de culture, des questions de soci\u00e9t\u00e9 et d\u2019environnement. Avec d\u00e9j\u00e0 sept ans d\u2019exp\u00e9riences, elle s\u2019emploie quotidiennement \u00e0 donner de la voix aux id\u00e9es \u00e0 travers l\u2019\u00e9criture.\",\"sameAs\":[\"https:\/\/facebook.com\/profile.php?id=100075035589093\"],\"url\":\"https:\/\/www.afro-impact.com\/en\/author\/omonlayo\/\"},{\"@type\":\"PostalAddress\",\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#local-main-place-address\",\"streetAddress\":\"Carr\u00e9 2167 Kindonou, Cotonou, BENIN, 07 BP 1128 Cotonou, BENIN\",\"addressLocality\":\"Cotonou\",\"postalCode\":\"+229\",\"addressRegion\":\"Littoral\",\"addressCountry\":\"BJ\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#local-main-organization-logo\",\"url\":\"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/01\/logo-afro-impact-share-social.png\",\"contentUrl\":\"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/01\/logo-afro-impact-share-social.png\",\"width\":300,\"height\":300,\"caption\":\"Afro impact\"}]}<\/script>\n<meta name=\"geo.placename\" content=\"Cotonou\" \/>\n<meta name=\"geo.position\" content=\"6.389282121878214;2.3602318590634495\" \/>\n<meta name=\"geo.region\" content=\"Benin\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Mali: Gouina hydroelectric dam inaugurated - Afro impact","description":"Mali's interim Prime Minister, Colonel Abdoulaye Ma\u00efga, and those of Guinea, Bernard Goumou, Mauritania, Mohamed Bilal Messaoud and Senegal, Amadou Ba, inaugurated the Gouina hydroelectric dam on Saturday, 45 km from Kayes, in western Mali. The dam is a regional project with a capacity of 140 megawatts (MW) and is being built by the Organisation pour la Mise en Valeur du fleuve S\u00e9n\u00e9gal (OMVS).","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/","og_locale":"en_US","og_type":"article","og_title":"Mali: Gouina hydroelectric dam inaugurated - Afro impact","og_description":"Mali's interim Prime Minister, Colonel Abdoulaye Ma\u00efga, and those of Guinea, Bernard Goumou, Mauritania, Mohamed Bilal Messaoud and Senegal, Amadou Ba, inaugurated the Gouina hydroelectric dam on Saturday, 45 km from Kayes, in western Mali. The dam is a regional project with a capacity of 140 megawatts (MW) and is being built by the Organisation pour la Mise en Valeur du fleuve S\u00e9n\u00e9gal (OMVS).","og_url":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/","og_site_name":"Afro impact","article_publisher":"https:\/\/www.facebook.com\/AfroimpactMag","article_author":"https:\/\/facebook.com\/profile.php?id=100075035589093","article_published_time":"2022-12-05T12:02:11+00:00","article_modified_time":"2023-06-19T10:29:45+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/12\/barrage-gouina-mali-inaugure.webp","type":"image\/webp"}],"author":"Eliane Fatchina","twitter_card":"summary_large_image","twitter_creator":"@AfroimpactMag","twitter_site":"@AfroimpactMag","twitter_misc":{"Written by":"Eliane Fatchina","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#article","isPartOf":{"@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/"},"author":{"name":"Eliane Fatchina","@id":"https:\/\/www.afro-impact.com\/#\/schema\/person\/5c48f58a7d0cc36b8d96110a4feedf77"},"headline":"Mali: Gouina hydroelectric dam inaugurated","datePublished":"2022-12-05T12:02:11+00:00","dateModified":"2023-06-19T10:29:45+00:00","mainEntityOfPage":{"@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/"},"wordCount":376,"commentCount":0,"publisher":{"@id":"https:\/\/www.afro-impact.com\/#organization"},"image":{"@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#primaryimage"},"thumbnailUrl":"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/12\/barrage-gouina-mali-inaugure.webp","articleSection":["Business"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#respond"]}],"copyrightYear":"2022","copyrightHolder":{"@id":"https:\/\/www.afro-impact.com\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/","url":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/","name":"Mali: Gouina hydroelectric dam inaugurated - Afro impact","isPartOf":{"@id":"https:\/\/www.afro-impact.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#primaryimage"},"image":{"@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#primaryimage"},"thumbnailUrl":"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/12\/barrage-gouina-mali-inaugure.webp","datePublished":"2022-12-05T12:02:11+00:00","dateModified":"2023-06-19T10:29:45+00:00","description":"Mali's interim Prime Minister, Colonel Abdoulaye Ma\u00efga, and those of Guinea, Bernard Goumou, Mauritania, Mohamed Bilal Messaoud and Senegal, Amadou Ba, inaugurated the Gouina hydroelectric dam on Saturday, 45 km from Kayes, in western Mali. The dam is a regional project with a capacity of 140 megawatts (MW) and is being built by the Organisation pour la Mise en Valeur du fleuve S\u00e9n\u00e9gal (OMVS).","breadcrumb":{"@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#primaryimage","url":"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/12\/barrage-gouina-mali-inaugure.webp","contentUrl":"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/12\/barrage-gouina-mali-inaugure.webp","width":1024,"height":576,"caption":"Aerial view of the Gouina dam on the Senegal River Source photo: rfi"},{"@type":"BreadcrumbList","@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"News","item":"https:\/\/www.afro-impact.com\/"},{"@type":"ListItem","position":2,"name":"Economie","item":"https:\/\/www.afro-impact.com\/economie\/"},{"@type":"ListItem","position":3,"name":"Mali: Gouina hydroelectric dam inaugurated"}]},{"@type":"WebSite","@id":"https:\/\/www.afro-impact.com\/#website","url":"https:\/\/www.afro-impact.com\/","name":"Afro impact","description":"L&#039;Afrique vu autrement","publisher":{"@id":"https:\/\/www.afro-impact.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.afro-impact.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/www.afro-impact.com\/#organization","name":"Afro impact","alternateName":"carrecube","url":"https:\/\/www.afro-impact.com\/","logo":{"@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#local-main-organization-logo"},"image":{"@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/AfroimpactMag","https:\/\/x.com\/AfroimpactMag","https:\/\/www.youtube.com\/channel\/UCJNIRcX4sVo487fhv0p5KDw"],"publishingPrinciples":"https:\/\/www.afro-impact.com\/a-propos-magazine-afro-impact\/","ownershipFundingInfo":"https:\/\/www.afro-impact.com\/mentions-legales\/","actionableFeedbackPolicy":"https:\/\/www.afro-impact.com\/conditions-generales\/","correctionsPolicy":"https:\/\/www.afro-impact.com\/dmca-retrait\/","address":{"@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#local-main-place-address"},"geo":{"@type":"GeoCoordinates","latitude":"6.389282121878214","longitude":"2.3602318590634495"},"telephone":["+229 54900806"],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"00:00","closes":"23:59"}],"email":"redaction@afro-impact.com","vatID":"0 2022 1395 5557"},{"@type":"Person","@id":"https:\/\/www.afro-impact.com\/#\/schema\/person\/5c48f58a7d0cc36b8d96110a4feedf77","name":"Eliane Fatchina","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.afro-impact.com\/#\/schema\/person\/image\/","url":"https:\/\/www.afro-impact.com\/wp-content\/litespeed\/avatar\/5f9f737261a53c0e086b34b0464cb9e1.jpg?ver=1777623498","contentUrl":"https:\/\/www.afro-impact.com\/wp-content\/litespeed\/avatar\/5f9f737261a53c0e086b34b0464cb9e1.jpg?ver=1777623498","caption":"Eliane Fatchina"},"description":"Eliane Yabo Omonlayo Fatchina est une journaliste reporter \u00e0 Afro impact. Titulaire d\u2019une licence professionnelle en journalisme \u00e0 l\u2019ENSTIC du B\u00e9nin, elle est une panafricaniste passionn\u00e9e de culture, des questions de soci\u00e9t\u00e9 et d\u2019environnement. Avec d\u00e9j\u00e0 sept ans d\u2019exp\u00e9riences, elle s\u2019emploie quotidiennement \u00e0 donner de la voix aux id\u00e9es \u00e0 travers l\u2019\u00e9criture.","sameAs":["https:\/\/facebook.com\/profile.php?id=100075035589093"],"url":"https:\/\/www.afro-impact.com\/en\/author\/omonlayo\/"},{"@type":"PostalAddress","@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#local-main-place-address","streetAddress":"Carr\u00e9 2167 Kindonou, Cotonou, BENIN, 07 BP 1128 Cotonou, BENIN","addressLocality":"Cotonou","postalCode":"+229","addressRegion":"Littoral","addressCountry":"BJ"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.afro-impact.com\/en\/mali-gouina-hydroelectric-dam-inaugurated\/#local-main-organization-logo","url":"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/01\/logo-afro-impact-share-social.png","contentUrl":"https:\/\/www.afro-impact.com\/wp-content\/uploads\/2022\/01\/logo-afro-impact-share-social.png","width":300,"height":300,"caption":"Afro impact"}]},"geo.placename":"Cotonou","geo.position":{"lat":"6.389282121878214","long":"2.3602318590634495"},"geo.region":"Benin"},"_links":{"self":[{"href":"https:\/\/www.afro-impact.com\/en\/wp-json\/wp\/v2\/posts\/13448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.afro-impact.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.afro-impact.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.afro-impact.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.afro-impact.com\/en\/wp-json\/wp\/v2\/comments?post=13448"}],"version-history":[{"count":0,"href":"https:\/\/www.afro-impact.com\/en\/wp-json\/wp\/v2\/posts\/13448\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.afro-impact.com\/en\/wp-json\/wp\/v2\/media\/13445"}],"wp:attachment":[{"href":"https:\/\/www.afro-impact.com\/en\/wp-json\/wp\/v2\/media?parent=13448"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.afro-impact.com\/en\/wp-json\/wp\/v2\/categories?post=13448"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.afro-impact.com\/en\/wp-json\/wp\/v2\/tags?post=13448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}